Definition |
- Synchronous operation of double deck lift and group control for optimal operation
|
Goals |
- Lift capacity maximization by overcoming the physical limit and operation efficiency increase with optimized group control technologies
|
Performance Goals |
|
As-is |
To-be |
Lifting Rate |
|
|
Capacity |
|
|
Installation |
- 100%
(5 masts & 8 cages installed at the height of 380 meters)
|
|
Operation Efficiency |
- Random lift call caused by the lack of current location information
- Frequent stops in peak-time
|
- Minimization of stops of lift by collecting the information of target floors
|