Double deck lift and Group Operation Control

Definition
  • Synchronous operation of double deck lift and group control for optimal operation
Goals
  • Lift capacity maximization by overcoming the physical limit and operation efficiency increase with optimized group control technologies
Performance
Goals
As-is To-be
Lifting
Rate
  • 100%
  • 170%
Capacity
  • 3.0 ton
  • More than 5 tons
Installation
  • 100%
    (5 masts & 8 cages installed at the height of 380 meters)
  • Less than 70%
Operation
Efficiency
  • Random lift call caused by the lack of current location information
  • Frequent stops in peak-time
  • Minimization of stops of lift by collecting the information of target floors