SuperTec announced that a full-scale prototype of a newly developed prefabricated wall module will be tested.
The mockup test of the innovative modules (3m x 5m) for super-tall buildings aims to verify the safety of the joints and concrete form.
The load bearing test and construction are scheduled in SENVEX laboratory in May 2019.
